Defence and Security Accelerator

Fourth Contract deliverable submitted

We have submitted our fourth contract deliverable, The Sprint 3 Report this week. This document is a technical report describing results from the third sprint and a development phase for the Game Engine Enabled Electro-Magnetic Modelling (GE3M2) project research at the TRL3 phase. The development includes work on augmented terrain prepared for propagation modelling, including a dynamic Google Tile streamer to load Google geographical data straight into the simulator. A docking system has been added to provide multiple views of the same terrain, along with graphs and plots. An ORBAT system that meets the training needs has been built. Finally, the Morton Technologies propagator has been integrated using a test harness tool.

Author

Amy Somerville

Leave a comment

Your email address will not be published. Required fields are marked *